The Big Girl Playhouse
There’s this crazy couple that we know that wanted a bigger storage shed.
Husband of said couple requested something large enough so that he wouldn’t hit his head on it.
He also had a budget.
Wife of said couple wanted a dreamy, glass-encased, whimsical, outdoor, greenhouse-inspired ‘space’.
She had no budget.
The planning process was an interesting one.
I was just excited after many meetings and dinners with said couple, to finally put our design into action.
After clearing the land, we used a torture device called an ‘Auger’ to dig (8) four foot deep holes for our support posts.
I hated the Auger by the end of the day. I even kicked it once. Then I drug it behind my van to teach it a lesson all the way back to the rental place. Alright, so really I towed it back to the rental place. But don’t think I didn’t dream about dragging it back. ‘Cuz I did.
We leveled, and measured and leveled some more, before setting the gigantic 12’ posts into the earth and backfilling them with earth.
I was very bruised and tired by this point.
We attached pressure treated stringers around the top and bottom of the structure, cinching in all the free-flowing posts. I kept telling the posts to ‘Get in line!’, but they didn’t listen for the most part. Stubborn posts. We added 8’ header/beams across the top. These were also 4×6 pressure treated posts.
Attaching the last beam to the top stringer was our goal today for quittin’ time.
I was thinking about last night’s leftovers waiting for me in the fridge as soon as I got home.
And a nice shower.
And maybe a glass of wine.
And Cowboy.
And although I felt victorious about meeting our goal today, I think I was more excited about going home to my leftovers and a glass of wine.
Leftovers…yum.
Next step: rafters and raisin’ the roof. Woot woot.
Leave a Reply
Want to join the discussion?Feel free to contribute!